InitializingSimulated plantReference SWRO plant · 3 trains · 57,500 m³/d
–°C
Temperature
–g/L
Salinity
–NTU
Turbidity
–
pH
--:--:--
SIM --:--:--
Energy & Carbon
Energy and carbon
Where the plant's energy goes, and what AquaTwin's strategies change. Energy is modelled; carbon is an estimate.
Specific energy
– kWh/m³
Plant power
– MW
Carbon intensity of water
– kg CO₂e/m³
Energy by process stage · live
Modeled
Waiting for telemetry…
Baseline vs disturbance vs AquaTwin
24 h Scenario Lab forecasts
Run scenarios in the Scenario Lab to compare energy outcomes here.
Power and grid carbon · last 24 h
Estimated emissions – t CO₂e / 24 hEstimated
Carbon is an estimate: an illustrative diurnal profile around 0.468 kg CO₂e/kWh (UAE, 2024, lifecycle basis; Ember). It is not metered data and is not specific to any plant or supplier.