InitializingSimulated plantReference SWRO plant · 3 trains · 57,500 m³/d
—°C
Temperature
—g/L
Salinity
—NTU
Turbidity
—
pH
--:--:--
SIM --:--:--
Membrane Health
Membrane health and degradation outlook
Normalised performance (ASTM D4516 concept) computed with the hybrid twin at standard conditions: NPF, NDP, NSP relative to the post-clean baseline.
Train 2 · NPF and projection
Waiting for telemetry…
Projection: OLS trend on the last 24 h of NPF estimates; band from the confidence band of the fitted line; probability from the slope's sampling distribution.
Why AquaTwin flags this train
Waiting for telemetry…
Accelerated-fouling stress test
Simulated
Forecast Train 2 under a severe biofouling event, with and without AquaTwin.